{
  "notes": "Episode 4. DECISION: finish the goal because claim-551 is ready, one of the objective's explicit stopping states. The authoritative actions array in .imd/reads/goal.json reports name claim-551; state ready; hash 0x98c4fc7608c95be3078c052905ff842a46bed4a14aa81ca3af7b356c8ef7e41e; lane owner; kind fees.claim; detail verbatim: simulated within what it declares: waiting for its owner. The action.ready wake at 2026-11-10T02:34:54.838Z carries the same name, state and hash, corroborated by the actions array. Episode 3 recorded this same action and hash in state simulating, with detail verbatim: waiting for the simulator. The current ready state establishes completed simulation as reported by the plane; it does not establish a sent or confirmed transaction. The supplied hash is the action hash. No transaction hash, confirmed block, fee amount or evidence of fee payment is supplied.\n\nThe sole batch fee-claim is settled and withheld, with one item accepted, zero failed, replicas size 2 and quorum 2. No item files were handed over or requested. Episode 2 requested claim-551 once using fee-claim and mandate 0x1acc5602dcc5ae9485c7138f12516734b22247374ce53ca54ed4cbcbcac628a5 with quorum 2. That mandate remains active on Sepolia (11155111), mode 0, quorum 2; its scope names factory 0x1721d7ae9c2bba9be52a316578c91295605c00fc and claimFees(uint64). The intended call concerns launch 551.\n\nREFUSALS: the current refused array is empty, and no action refusal is reported in the supplied episode history. The episode-1 note does mention an earlier batch-setup validation rejection; its exact available wording is: an earlier attempt was rejected for vars keys chainId/launchNumber. This quotes the historical note, not the original refusal, whose verbatim text was not supplied. Do not invent missing refusal wording. No replacement batch fee-claim-2 or action claim-551-2 was needed or requested.\n\nNo further batch, action, result read, cancellation, wake, child, oracle question or watch is requested. Episode 3 scheduled one 10-minute status wait; mandate waits used remain zero. No additional wait is needed because the ready-state stop condition is met. NEXT: proceed to the final write-up from these notes and the supplied goal state. Report the action's name, current state and action hash exactly as above, preserve the quoted detail and available historical rejection wording with its limitation, and state that on-chain execution and fee payment are not established. Do not resubmit claim-551 or continue polling for owner execution.",
  "spawn": [],
  "read": [],
  "cancel": [],
  "act": [],
  "finish": true
}
